丞相嗲嗲嗯啊古代h,,,

Welcome to the official website of Wuxi Chenna Machinery Co., Ltd. (Changzhou Chenna Hydraulic Machinery Co., Ltd.)!
LANGUAGE:CNEN
Precision piston rod

Professional Sincere Honest Win-win

HOTLINE:

+86-158 9532 0613

Hydraulic cylinder repair process

First, the surface treatment
After cleaning and sanding, the scratched parts are cleaned and cleaned with absorbent cotton, acetone or absolute ethanol. (If you do not clean first, the oil will be immersed in the cylinder, resulting in poor adhesion or even falling off. When grinding, first grind the part of the crushed area above the reference surface to the base surface to prevent the plunger. After scratching, use the assorted enamel to remove the oil stains and foreign matter from the scratched groove, and use the rotating hoe to blow the entire scratched surface.) Wash and warm and dry, wipe the polished surface with acetone. Try it clean. Then use a hot air blower or a iodine-tungsten lamp to dry the water and preheat the surface to be repaired, especially if the room temperature is below 15 °C.

Second, blending materials
Reconcile in strict proportions and mix well until there is no color difference.

Third, the application material
Apply evenly blended 2211F to the scratched surface. It should be thin and evenly and completely cover the scratched surface to ensure the material is bonded to the metal surface. Then apply the material to the entire repaired area and press repeatedly to ensure the material is filled and reached. The required thickness is slightly higher than the inner wall surface of the cylinder.

Fourth, curing
It takes 24 hours for the material to fully reach the performance at 24 ° C. In order to save time, the temperature can be increased by the tungsten halogen lamp. For every 11 ° C increase in temperature, the curing time is shortened by half, and the curing temperature is 70 ° C.

Fifth, after the material is solidified, use a fine grindstone or scraper to repair the surface of the material above the surface and finish the construction.

Sixth, the repair of the surface of the piston rod
The surface of the piston rod is directly scratched or bumped due to internal or external reasons. The internal causes are: pollution of hydraulic oil, foreign matter in the hydraulic system, and entry into the cylinder; external causes include: harsh environment operation, mining, mountainous area, During demolition and construction work, there is a hard object colliding with the surface of the piston rod, which causes damage to the surface of the piston rod.

2019/09/25 09:26:49 2420 次


Related Documents
Copy right ? 2019 Wuxi Chenna Machinery Co., Ltd.(Changzhou Chenna Hydraulic Machinery Co., Ltd.) All rights reserved.
影音先锋人妻啪啪av资源网站| 农村肥bwbwbwbwbw| 美女脱精光隐私扒开无遮挡| 男女无遮挡xx00动态图120秒| 国产真实伦对白全集| 丰满双乳秘书被老板狂揉捏| 各处沟厕大尺度偷拍女厕嘘嘘| jealousvue成熟分类| 日本一区二区在线播放| 富婆一对一刺激交友| 国产寡妇xxxx猛交69| 6080YYY午夜理论AA片| 无码人妻aⅤ一区二区三区| 国产在线av一区二区麻豆董小宛 | 50歳のバツ1熟女とハメ撮り | 太大太长太粗太久太硬了| 成人免费在线电影| 成免费crm在线看系统| 在床边趴着屁股撅起来怎么弄| 日本护士xxxx做爰| 里番acg里番成人本子| 国产愉拍av免费视频一区 | 国产AV无码| 婷婷色啪啪色窝窝一区| √天堂资源地址在线官网| 附近秒约一泡| 久久精品人妻一区二区蜜桃| 麻豆传媒视频| japanese日本丰满少妇| 少妇高潮a片无套内谢麻豆传| 国产亚洲色婷婷久久99精品| 老师好大好爽我要喷水了视频| 日韩人妻精品无码一区二区三区 | 国产vpswindows精品| 国子监来了个女弟子电视剧免费观看| 久久久综合精品一区二区三区 | 美妙人妻系列| av免费网站在线观看| 国产99精品视频一区二区三区| 国产精品久久久亚洲偷窥女厕| 久久久久亚洲av成人网人人软件 |